Kolubara Bridges

Location: Obrenovac, Serbia

Size: -- m2

Completion Date: 2018.

Sector: Infrastructure

100%

The bridges over the Kolubara river are two independent constructions with dimensions of  26,0m + 6 x 35,0m + 26,0 m. The total width stands at 29.4 meters. Each of the two parts of the bridge consists of two prestressed ‘T’ pillars with a height of 160 cm.