Kolubara Bridges

Location: Obrenovac, Serbia

Size: -- m2

Completion Date: 2018.

Sector: Infrastructure

100%

The bridges over the Kolubara river are two independent constructions with dimensions of  26,0m + 6 x 35,0m + 26,0 m. The total width stands at 29.4 meters. Each of the two parts of the bridge consists of two prestressed ‘T’ pillars with a height of 160 cm.

PROJECT LOG

Active projects:

HS Corporation

Headquarters

Zrenjanin, Serbia

Log Updated: 07.10.21.

Union Šped

Ugrinovci, Serbia

Log Updated: 16.08.21.

Corp

Ugrinovci, Serbia

Log Updated: 26.04.21.

Albo

Batajnica, Srbija

Log Updated: 18.09.21.

Completed projects:

Rumafil

Ruma, Serbia

Log Updated:

RC Nest Užice

RC Nest Užice

Užice, Serbia

Log Updated:

Novi tekstili

Novi tekstili

Bečej, Serbia

Log Updated:

Gomex

Zrenjanin, Serbia

Log Updated: 11.04.21.

Delta Agrar

Nova Pazova

Log Updated: 11.04.21.

Jokey

Nova Pazova

Log Updated: