Drenik

Lokacija: Krnjača

Kvadratura: 4550 m2

Datum završetka: 2018

Oblast: Industrial

100%

Penta Ge.Co. has been entrusted with the construction of an industrial hall for the company“Drenik”. Work done includes: prefabricated concrete construction, facade works – prefabricated ab panels, roofing works, locksmith works – exterior, drainage from the roof – vacuum system

 

PROJECT LOG

Aktivni projekti

Corp

Ugrinovci, Serbia

Log Updated: 26.04.21.

40%

Union Šped

Ugrinovci, Serbia

Log Updated: 16.08.21.

100%

HS Corporation

Headquarters

Zrenjanin, Serbia

Log Updated: 07.10.21.

20%

Albo

Batajnica, Srbija

Log Updated: 18.09.21.

60%

Završeni projekti

Kolubara Bridges

Obrenovac, Serbia

Log Updated: 01.12.2018.

100%

Jokey

Nova Pazova

Log Updated:

100%

Farmina 3

Inđija, Serbia

Log Updated: 25.09.2020.

100%

Novi tekstili

Novi tekstili

Bečej, Serbia

Log Updated:

100%

RC Nest Kraljevo

Kraljevo, Serbia

Log Updated: 25.03.2020.

100%

Drenik

Krnjača

Log Updated: 21.02.2019.

100%